This Part Takes the Longest
09/01/2014
Putting in the wiring.
Duct work for the heating and cooling.
Repairing the water damage to the fireplace.
New floor plan for the bathrooms and the laundry room.
Sometimes I think they just like to rip holes in the ceiling!
Adding plumbing.
The outside looks much better.
The foundation was completely dug up, waterproofed and gravel was added. The basement is completely dry now.
The back patio was removed and needs to be completely replaced in the spring.